On Ground

Open land can become utility-scale solar generation faster, with less civil work and less permanent site impact. MegaWAVE folds out onto a reusable ground support system designed for repeatable large-scale deployment.

01 · Support

The reusable footing for open ground.

For ground-mounted projects, SOLAR WAVES uses a reusable support system instead of a permanent concrete base. The footing is designed to reduce site preparation, simplify installation, and allow future redeployment where project conditions change.

Ground support system
On ground

Ground support system

A reusable, no-concrete footing that provides a stable base for the MegaWAVE on open land. It is designed for fast positioning by a small crew using standard site equipment.

02 · Features

Utility-scale solar without the heavy construction site.

Utility-scale rollout

Utility-scale rollout

Designed for large, repeatable fields where deployment speed, layout consistency, and reduced site work matter.

Rapid deployment

Rapid deployment

Factory-prepared assemblies reduce the number of field operations required before generation can begin.

Low-impact footing

Low-impact footing

Reusable support reduces permanent ground disturbance and avoids unnecessary civil works where site conditions allow.

Built for repeatable fields

Built for repeatable fields

Each MegaWAVE follows the same geometry and deployment sequence, making large ground arrays easier to plan, install, and scale.

03 · The constant

The same MegaWAVE. The same repeatable deployment sequence.

Across deployment types, each MegaWAVE follows the same sequence: manufactured, delivered, positioned, unfolded, connected, and commissioned. This repeatable sequence supports utility-scale rollout planning across multiple sites and infrastructure types. The support system changes with the site. The MegaWAVE stays repeatable.

  1. 01

    Delivered

    Factory-assembled, pre-wired, and prepared for transport.

  2. 02

    Positioned

    Set onto the support system selected for the site.

  3. 03

    Unfolded

    The wave structure opens into its full generating span.

  4. 04

    Connected

    Electrical connection and commissioning complete the deployment.

One MegaWAVE, every environment

The same MegaWAVE, a different support system.

Estimate annual output and savings for a site.Open the simulator
Next step

Talk to us about SOLAR WAVES.

Discuss site fit, pilot projects, deployment requirements, and support-system options with the SOLAR WAVES team.